Drop a Primavera P6 .xer file onto ArgusForge and get a complete DCMA 14-Point and GAO schedule assessment, nine schedule-quality checks, manpower and cost analysis, and a branded PDF ready for the owner's table — in seconds, entirely on your machine.
Free 7-day trial — full features, watermarked PDF exports. Start it in the app; no card required.
First launch, Windows may say "Windows protected your PC" — normal for new software. Click More info → Run anyway. ArgusForge is code-signed and 100% offline.
A 438-activity schedule, fully analyzed in under a second.
Drop in a schedule and ArgusForge reads it, scores it against DCMA, flags the failing activities, and simulates the finish — in about a second. Here's the loop, running live.
The incumbent tools price schedule analysis like it's a luxury. For a five-scheduler firm, the difference isn't a discount — it's two orders of magnitude.
One-time payment. Fuse figure is an estimate of roughly $10,500/year per seat based on typical enterprise pricing; Acumen does not publish list prices. Verify current pricing with the vendor.
No feature gating between tiers. Every license — Solo to Enterprise — gets the complete toolset.
All 14 checks with editable thresholds, per-check scoring weights, and Standard / Aggressive / Lenient presets — plus plain-English fix guidance on every check.
SQ-1 through SQ-9 — missing logic, logic density, hard constraints, negative float, leads, lags, merge hotspots. All thresholds editable to match your contract.
Critical path in red, near-critical in amber, with pan, zoom, and tooltips. A look-ahead filter scopes every tab to the next 30, 60, or 90 days.
Daily labor histograms with automatic spike, drop, gap, and overload detection — down to which specific resource is over-allocated.
Daily cost histogram plus cumulative S-curve on a dual axis, with by-resource-type breakdown. Handles rate-loaded schedules automatically.
A months-by-checks heat map exposes exactly when your schedule weakens. Click any cell to drill into the flagged activities for that period.
Revision-over-revision deltas, newly-flagged activity lists, and a multi-revision trend chart fed automatically by snapshot history.
Multi-page PDF with your firm's logo and colors, plus a 9-sheet Excel workbook with native charts. Reports that stand up to owner and federal review.
No telemetry, no cloud upload, no account. Data never leaves the machine unless you explicitly send a report. IT review takes minutes, not months.
Eight analysis tabs in a single window. Click any tab below to explore.




One screen shows the DCMA 14-Point score, the Schedule Quality score, and every check's pass-fail status with metrics against thresholds — with project vitals right at the top. A dedicated GAO tab scores the schedule against the U.S. GAO's ten best practices too.

Click any failed check and see exactly which activities triggered it — IDs, names, durations, float. No more hunting through P6 to find where the negative float lives.

ArgusForge builds a daily labor histogram from your resource assignments and automatically flags the patterns that wreck field productivity: sudden spikes, unexplained drops, and multi-week gaps with zero labor.

Managing more than one job? Point ArgusForge at a folder of .xer files — or pick several at once — and it scores every schedule and stacks them in a single sortable roll-up, so you know which jobs need attention before the next owner meeting.

Federal, transit, and infrastructure owners often score schedules against the U.S. GAO Schedule Assessment Guide instead of DCMA. ArgusForge runs both from the same .xer, so you walk into either review ready.

The Monte Carlo add-on runs 10,000 probabilistic iterations on your loaded schedule — in about half a second — and reports P10 through P95 finish dates, so you can commit to a date you can actually defend.
ArgusForge isn't trying to be a planning suite. It does one job — schedule quality and risk analysis — faster, cheaper, and with less friction than anything else in the category.
| ArgusForge | Acumen Fuse | Steelray | Excel template | |
|---|---|---|---|---|
| Pricing model | One-time, from $499 | ~$10,500/yr per seat (est.) | Subscription | "Free" + your hours |
| Time to deploy | 2 minutes, no admin rights | Months of procurement | Days–weeks | Instant, fragile |
| 100% offline analysis | Yes — by design | Varies by deployment | Varies | Yes |
| DCMA 14-Point with editable weights | Yes + saved presets | Yes | Yes | Manual formulas |
| Manpower leveling per resource | Yes | Add-on modules | Limited | No |
| Cost loading + S-curve | Yes | Yes | Limited | Manual |
| Monte Carlo schedule risk | Yes (add-on) | Separate product (Acumen Risk) | No | No |
| Multi-revision trend with snapshots | Automatic | Manual setup | Limited | Manual data entry |
| Branded PDF + Excel reports | Yes — your logo & colors | Yes | Yes | DIY |
| Plain-English fix guidance | Every check | No | Partial | No |
Competitor capabilities summarized from publicly available product information; verify current functionality with each vendor.
Export your schedule as a .xer file — the format every P6 installation produces natively. Multi-project .xer files open too.
Drag the file onto the window. Drop two files and the second auto-loads as your comparison baseline. Analysis completes in under a second.
Work the flagged items with built-in fix guidance, then export a branded PDF or 9-sheet Excel workbook — or send it straight to Slack or email.
No subscription. No usage fees. No feature gating — every tier gets the complete product. Free updates for 12 months from purchase.
A seat is one named user — install on the laptop and desktop you personally use without burning a second seat.
Something else on your mind? Write to sales@argusforge.net — a real person answers.
Join the planners who walk into owner meetings with a branded, defensible analysis instead of a stack of screenshots.